Hospital lighting upgrade for Moorfield Eye Unit, Northwick

Location: Harrow, Middlesex

Client: Moorfields Eye Hospital NHS Foundation Trust

Value: £60,000

Contract type: Design and installation

Overview

Upgrading lighting for one of Moorfields Eye Hospital district hubs.

Due to the nature of the working area, all works took place at night between 8pm and 4am to avoid risk to the public and disruption to service.

Barton Knight Contracting also liaised closely with the clinical teams in operating theatres to allow sufficient time for a deep clean ahead of service, to avoid any risk of contamination.

Key Works

  • Three hundred 600×600 fluorescent panels were replaced with energy-efficient LED equivalents.
  • Strip lights featuring sealed LED fittings were installed in/on sealed ceilings just outside the operating theatres, while sealed panels were fitted within the theatres.
  • In specified areas the new panels feature dimmable DALI systems for control over lighting levels.
barton knight accreditations

The Eye Centre at Northwick Park Hospital is one of the district hubs of the renowned Moorfields Eye Hospital, bringing expert eye care closer to where patients’ live. The specialist eye unit offers eye surgery as well as diagnostic, outpatient, and urgent care for a wide range of eye conditions, from cataracts and glaucoma through to general ophthalmology.

The hospital lighting upgrade project took just over a month to replace three hundred square fluorescent panels and strip fluorescent lighting with energy-efficient LED equivalents. In various locations, especially the exam/consult rooms, the new panels are dimmable DALI systems fitted to allow clinical staff more control over lux levels.

The operating theatre had new 600×600 LED panels fitted in the ceiling.

As a theatre were included in the project, cleanliness was imperative. The onsite electrical team ensured all possible prep work was done outside the theatre to avoid any risk of contamination.

Barton Knight Contracting’s operatives started the project by working on some areas in the day and some out-of-hours during the night. This approach was agreed with the Trust beforehand.

However, as work progressed, (and patients included a number of vulnerable people with impaired sight), the team quickly decided with the client to adjust the schedule and move all electrical works overnight, while the unit was shut.

The electrical works could therefore progress more quickly and effectively, so the clinic could operate as normal.

Equipment was stored offsite in the day and delivered on a van to site every night at 8pm, after the clinic shut.

The night electricians worked until 4am, loading up the van with equipment and old light fittings to be recycled. This meant the clinical team could do a deep-clean so the theatre was ready and running for patients when the unit opened.

The project was successfully delivered on time and to budget with no issues.

Why work with Barton Knight Contracting?

Significant experience in complex NHS work

Electrical, fire, access system and associated civil engineering work coordinated centrally

All employees H&S certified + Advanced CRB Checks

Dedicated project manager - ensures quick decisions to keep your project on schedule

Detailed quotations with site visits for in- depth project knowledge

Onsite foreman - for good collaboration and communication with all parties

Recommended by previous clients – ask us for details

Our Projects

Hospital lighting upgrade for Moorfield Eye Unit, Northwick

6-week project

Infrastructure upgrade for Newham Hospital

2.5 years

New Generators and Panels for St Peter’s Hospital

12-month project

Hillingdon Hospital ICU Conversion

14-week electrical project

Elective Procedure Rooms for New QEII Hospital

16-week project

Ophthalmic refurb & oncology new build for Kingston Hospital

6-month project