Prestige Student Developments

Location: Reading

Client: Prestige Student Developments

Value: N/A

Contract type: Contracted by Cool Projects Ltd. Design and installation of all electrics for lighting, power for new build student accommodation.

Overview

Barton Knight Electrical Service worked with mechanical contractor Cool Projects Ltd, providing a complete design and installation service for all electric work on this premium student accommodation project.

The development began in January 2020 and was completed in December 2020, with contractors working safely and flexibly throughout three Coronavirus lockdowns without compromising the high-quality workmanship required.

The accommodation has received five-star total ratings on various review sites such as www.studentcrowd.com.

Key Works

Full design and installation service for the electrics including internal and external lighting; power; high-speed wifi data cabling; a CCTV system, and a fire alarm system.

“All Barton Knight electricians are employed in-house - fully trained and accredited - so we were able to work flexibly around other contractors' schedules and COVID-19 procedures, without compromising the high quality of workmanship required for this premium development.”
Alan Edwards, Consultant for Barton Knight Contracting
barton knight accreditations

Number 79 Silver Street is a new student property in Reading, developed during the peak of COVID-19, during January-December 2020. Situated only six minutes’ walk from The University of Reading’s London Road Campus, the accommodation include 61 ensuite student bedrooms, built and furnished to the highest standards. Communal areas include state-of-the-art multi-use cinema/gaming/karaoke rooms, residents’ lounges with kitchen and dining areas, a fully-equipped fitness suite, and private study areas.

The original builder contracted for the project went into administration in early 2020, and Barton Knight was recommended thanks to its experience in high-quality electrical installation. Additional work was required for the student bedrooms.

Barton Knight provided a full design and installation service for the electrics including lighting (with LED downlights for communal areas and outside security lighting), power (including induction hobs), high-speed wifi data cabling, a CCTV system, and restoring the fire alarm.

A major complication during the project was COVID-19, as the development carried on through three lockdowns.

Although the property wasn’t occupied during the works, Barton Knight had to complete additional and ongoing risk assessments and plans to work safely, and co-ordinate with other contractors on site to establish and carry out COVID-19 precautions. Full PPE was provided for all staff), sanitation stations were set up, social distancing and isolation procedures were put into practice and the project was regularly deep-cleaned.

Why work with Barton Knight Contracting?

Significant experience in complex NHS work

Electrical, fire, access system and associated civil engineering work coordinated centrally

All employees H&S certified + Advanced CRB Checks

Dedicated project manager - ensures quick decisions to keep your project on schedule

Detailed quotations with site visits for in- depth project knowledge

Onsite foreman - for good collaboration and communication with all parties

Recommended by previous clients – ask us for details

Our Projects

New Generators and Panels for St Peter’s Hospital

12-month project

Hillingdon Hospital ICU Conversion

14-week electrical project

Elective Procedure Rooms for New QEII Hospital

16-week project

Ophthalmic refurb & oncology new build for Kingston Hospital

6-month project

Resilience for St Peter’s Hospital

6-month project

New generator panel for Wexham Park

2-phase project over 11 months